
About Project
Design & Construction of North-South Transmission Cable Tunnel Contract NSOwner:
LTA
LTA
Contract Period:
From – 6/15/2017
To – 2/1/2018
From – 6/15/2017
To – 2/1/2018
Status:
on-going
on-going
Type:
Infrastructure
Infrastructure
Ref:
SS70
SS70